wednesday, May 20
PROGRAM ERASMUS BIP 2026 "AI REVOLUTION: BUILDING SUSTAINABLE CITIES FOR TOMORROW"

Program – Day 3 | Erasmus BIP 2026
8 am - 9 pm | Place of departure: F0.11
Oosterschelde Storm Surge Barrier/Hoek van Holland
Field trip
The Oosterscheldekeringhttps://www.neeltjejans.nl/en/ (in English: Oosterschelde Storm Surge Barrier), between the islands Schouwen-Duiveland and Noord-Beveland, is the largest of the Delta Works, a series of dams and storm surge barriers, designed to protect the Netherlands from flooding from the North Sea. The construction of the Delta Works was a response to the widespread damage and loss of life in the North Sea flood of 1953.
For who?
- Visitors
- HAN students CT1
- Staff Built Environment

back and forth
